An independent sewage treatment plant in a suburban area will allow the correct way to solve the problem of waste disposal. It is relevant for settlements that are not connected to central networks. If the connection is not planned in the coming years, then a cesspool with overflow will be the best solution. The beneficial benefit of civilization will serve as an urban option. Is it comfortable, agree?
You will learn how to make a treatment plant with overflow by reading our article. It thoroughly disassembled options for the construction of systems, described the construction technology. The advantages that an autonomous sewer system will provide are listed.
The information presented on the specifics of the construction of overflow cesspools and the features of their operation is based on regulatory documents and the experience of independent builders. A compelling and valuable addition to the text are useful photo compilations, diagrams, and video guides.
The principle of operation and device
The design of the simplest cesspool with an overflow well includes two objects interconnected by a pipe segment.
The first is a large sealed container, constructed on the principle of a storage tank with impermeable walls and a bottom.
The second part of the structure is arranged exactly the same as the filter version of the sewer well. This means that it does not have an impenetrable monolithic bottom. Instead of a continuous concrete slab, a kind of filter with a capacity of 1 m or more is constructed in the zone of the conditional bottom.
The filter is made in the form of filling from materials with high filtration properties: crushed stone, slag, gravel and / or sand.
A cesspool with overflow is arranged to increase the degree of sewage treatment, which makes it possible to partially discharge them into the soil, filtration fields, into sewer ditches or sewage ponds
The walls can be made solid and with holes to increase the rate of removal of recycled effluents from the filter well, otherwise called absorption.
The simplest design of a cesspool with an overflow compartment includes two parts, the first of which serves as a storage tank, the second - an absorption well
A cesspool and a filtering well are connected by overflow - a pipe located at an angle to the side of the absorber. The depth of its laying depends on the climatic data of the region, i.e. like any overflow laid in the ground, the pipeline should be below the level of seasonal freezing of the soil.
A sewer pipe is brought to the drive, through which waste water will flow from the internal sewage system to the storage tank.
The diagram shows in detail the principle of a cesspool with an overflow section. The pipe connecting the sections of the structure should be located at the correct height and with a slight slope
Over the cesspool arrange overlap with a hatch designed to pump out the contents. The ventilation pipe is mounted so that the lower edge is higher than the drain horizon at any degree of filling. The second end of the pipe is brought to the surface.
For a cesspool with one filtering well, only one ventilation duct can be built, but it is better to equip each compartment of the simplest treatment plant with its own ventilation.
This design allows you to make the waste treatment process more efficient and faster. First, all the waste enters the first sealed chamber. Here they accumulate and decompose under the influence of bacteria. Gradually, there is more waste, the liquid level in the chamber rises and reaches overflow.
As the storage tank is filled, the excess that has settled and is partially cleaned by bacteria through the pipe mounted in its wall is poured into the next well
The insoluble part of the effluent settles at the bottom, and partially clarified with the participation of bacteria and the settled liquid component reaches the level of overflow installation as it is filled and by gravity moves to the absorption well, in which the sewage system is refined.
In the filtering well, the effluent passes through the drainage layer and enters the soil, again being further cleaned through a natural earthen filter. And solid waste in the form of silty sediments accumulate in the sealed compartment of the cesspool, from which they are subsequently extracted and, if desired, the hosts are used as starting material for composting.
Why do we need such difficulties, because it is easier to pump out the sewer mass from the cesspool and thus get rid of it? The presence of two containers significantly increases the size of the sewage system, part of the effluent, after passing through natural cleaning, is transferred to the ground, due to which the number of calls of sewage trucks is significantly reduced.
An increase in the number of sewer wells allows the collection and processing of more effluents and improves the quality of treatment
With an increase in the number of overflow wells, the scheme is somewhat more complicated. However, this increases the period from the receipt of waste in the tank to the movement of the liquid component into the ground. This improves the quality of wastewater treatment and makes them safer for the environment.
Practice shows that a sewage treatment plant of two or more wells emits significantly less unpleasant odors than the usual version of this kind of design. Usually there are no odors or they are insignificant. The use of special bacteria will help improve the situation with the processing of sewage and the elimination of odors.
The unpleasant squelching sounds that a crowded cesspool makes are absent in the overflow design. Owners of such a structure usually do not have to save sewer resources. They can safely use the water without worrying about overflowing their sewers.
It is desirable to arrange the local sewage system so that it does not interfere with movement around the site and access is provided for emptying and servicing if necessary
Figures and basic standards
Before starting construction work, you should choose a suitable place for the pit with overflow. Standards for the remoteness of the structure from other objects on the site are approximately the same as for a conventional cesspool, since the problem of groundwater pollution is still relevant.
You should also consider the characteristics of the soil on the site. The higher the permeability of the soil, the greater should be the distance separating the two-chamber cesspool from other buildings.
Depending on the type of soil, it is recommended to locate the sewage system at a distance from the apartment building:
- not less than 15 m - for sandy, crushed, pebble and gravel soils;
- not less than 10 meters - for sandy loam.
Sink pits with an overflow effect are arranged only on soils with high filtration qualities. If the base of the absorption facility is supposed to be clay, rock or half-rock, it will be necessary to abandon the installation of a treatment plant of a similar design.
The construction of a cesspool with an overflow well is allowed on soils with good filtration ability. Disposal of treated effluents into rock and clay rocks is not possible
A solid should be the space separating the source of drinking water and the sewer:
- not less than 50 m - for sand;
- not less than 30 meters - for sandy loam.
Since the creation of a structure consisting of two chambers takes more time and effort than with the construction of a conventional cesspool, it makes no sense to make a small volume structure. The minimum recommended design capacity is 2 cubic meters. meter. Such parameters provide sewage throughput in the range of 0.2-0.5 cubic meters. m / h
When designing a structure, it is also recommended to consider some parameters. For example, the optimal distance between the cells of the cesspool is one meter. Although there are structures in which the cameras are separated simply by a thick wall. In this adjacent wall, a hole for overflow is arranged. But this option is considered less effective.
It is recommended that the overflow be given a slope standard for sewer pipelines in order to facilitate the movement of liquid effluents into the filter well. The sewer pipe leading from the house is positioned at a similar slope - 1.5 cm of height for each meter of pipe is sufficient.
If the sewage system is arranged correctly, there will not be any problems with it. Nevertheless, it is recommended to regularly check the filling level of the structure. If filters are installed inside the structure, their condition should be monitored at least once a month.
Options for the construction of treatment facilities
When choosing a place for a cesspool, it is necessary to provide access roads for special equipment. If this is not possible, during the installation of the sewage system, manual excavation of the pit will have to be carried out manually. The procedure for manual cleaning of the drive from human waste can be even more complicated and quite unpleasant.
A variety of tools can be used to make a two-chamber cesspool. Of course, it is important that they ensure tightness to the first compartment of the structure and permeability to the second. The most common version of such structures is a rake from concrete rings.
Ready-made concrete rings with special holes can be used to make the filter compartment of a home-made treatment plant
In the first chamber, the bottom is concreted, or a concrete slab is laid down; in the second chamber, the bottom is closed with a meter-long layer of filter material: crushed stone, gravel and / or sand. Suitable for the construction of a cesspool and brick. The bottom of the sealed brick compartment should also be concreted. On this basis, brickwork is performed.
The bottom of the second section of the cesspool is left free and, as with concrete rings, is covered with gravel or gravel. Actually, such a filter layer is used in any variant of the permeable section of the cesspool. Brickwork here can be done with gaps to make the walls permeable. This will reduce brick consumption and uptime.
Brick is a very suitable material for creating a cesspool with overflow. From it you can make a sealed and permeable compartment of the structure
Another way to equip a sealed cesspool is to pour concrete. To do this, you need to make the crate and strengthen the walls of the structure with the help of reinforcement. This is a rather time-consuming and costly method, it is used infrequently.
The possibilities of creating a filtering part of a cesspool are more diverse. Here you can install a perforated plastic container or even make a hole out of used tires. Some used large galvanized containers installed in the pit for the construction of both compartments at a distance from each other.
Using improvised materials to create a sewage system, it should be remembered that they must be in contact with a humid and aggressive environment for a long time. Only those materials that are resistant to such conditions can be considered acceptable.
Three-chamber design
If the dimensions of the suburban possessions allow, it is better to make not two, but three overflow wells for the treatment of effluents from one cesspool. All these departments, of course, are connected by overflow. At the same time, the distance between the chambers can be made smaller - only 70 cm. It is recommended that the size of each chamber, for example, the diameter of concrete rings, be at least one meter.
If desired, you can arrange a cesspool of three or more parts. Only the last section of the structure should have a filtering bottom, and the first two should be sealed
The first two wells are intended for the treatment of effluents, and the last - for filtering the past two degrees of purification of the liquid component of the sewer mass. Its bottom and / or walls are permeable, as in the construction of a two-chamber sewer.
The treated effluents can be redistributed not only to the underlying layers, but also discharged into sewer ditches or non-operational reservoirs. Sewage from the sewage treatment plant can be transported to the filtration fields through drains - pipes with holes for the release of the refined liquid component.
Drains are laid in sedimentary incoherent soils of different densities, preferably without loam layers. The drainage system is constructed at a depth, the mark of which is below the level of soil freezing by the actual thickness of the pipe. Drains are wrapped with a layer of geotextile, and then covered with crushed stone or gravel with sand aggregate.
The presence of three chambers increases the volume of sewage and significantly improves the treatment of effluents. The liquid obtained at the outlet can be used for various technical needs, usually for irrigation.
Stages of building a monolithic system
Those who want to pour a monolithic septic tank out of concrete will significantly save on costs, but they will build much longer than those who decide to buy ready-made concrete rings. Briefly about the process of the device in the photo selection:
Image Gallery
Photo from
For the construction of a cesspool with overflow, we develop a pit. The size of the pit should take into account the dimensions of the sewer facility and ease of operation
The bottom of the pit is filled with a layer of sand with a thickness of 15 - 20 cm. The sand cushion is thoroughly tamped, previously moistened with water
According to a pre-made project, we are constructing the formwork. Inside the fences, indicating the contours of future walls, we put reinforcement in the form of a grid of horizontal and vertical bars
Before pouring concrete into the pit, we introduce sewer pipes, into the partitions between the compartments we install sleeves at the projected height and pour concrete
After 28 days, the concrete poured into the formwork will gain the strength necessary for further work. After this period, we remove the formwork
We build the formwork for pouring the slab over the cesspool with overflow. We install a hatch above each compartment
We lay polyethylene on the plank bottom of the formwork constructed for overlapping. Pour concrete over it with a layer of about 5-7 cm, lay the reinforcing mesh and again pour 5 cm of concrete
After a minimum of 14 days, preferably after 28, we fill up the concrete floor with the soil-plant layer and put the object into operation. It is advisable to build a fence around the pit
Step 1: Digging a pit pit with overflow
Step 2: sand cushion device
Step 3: Construction of the formwork for filling the walls of the pit
Step 4: Pouring concrete into the constructed formwork
Step 5: Dismantling the formwork after building strength
Step 6: Slab formwork device
Step 7: Fill the Reinforced Concrete Slab
Step 8: Arrangement of the site around the cesspool
Installation procedure for a two-chamber pit
Work on the construction of a two-chamber sewage system begins with marking. It is necessary to determine the location and configuration of both pits. You can dig one large pit, install containers in it, and then fill up the space between them with soil, but usually this only increases the cost and time of construction work.
Usually they dig a pit using an excavator.If you decide to dig manually, use a shovel and a bucket on a rope, with which they take out the earth. When using concrete rings, digging a pit can be done as follows: first, a ring is installed in the right place, then they begin to dig inside, gradually undermining the soil under the walls of the ring.
Image Gallery
Photo from
Stage 1: Installing the ring in the prepared pit
Stage 2: Assembly of the mine of the sewer facility
Stage 3: The second chamber of the cesspool with overflow
Stage 4: Ensuring the tightness of objects
Stage 5: Waterproofing the sewer facility
Stage 6: Filling the foundation pit with filtering ability
Stage 7: Installation of the neck of the sewer chambers
Stage 8: Sewer hatches in the suburban area
Gradually, the ring will descend down the cylindrical shaft. This method is especially appropriate on light soils, as it prevents the walls of the pit from shedding. In all other cases, it is recommended that the walls of the pit be given a slight slope so that they do not crumble and collapse.
After the pits are dug, you need to equip the bottom, i.e. pour it with concrete screed. Crushed stone is added to the solution to make the bottom more solid. If concrete rings are already laid, then concreting is performed inside the circle.
A sealed concrete structure for a cesspool with an overflow on the outside should be treated with a layer of some waterproofing material, for example, coated with resin
If it is decided to use a plastic container as an airtight chamber, the base is concreted for its installation. The container is lowered into the foundation pit on a frozen concrete slab and gently filled with earth.
As you backfill inside the tank, it is recommended to gradually pour water so that a large amount of soil does not crush the structure. Water will balance internal and external pressure.
In the second chamber, as already mentioned, instead of a concrete solution, a layer of filter material is covered. The technology for erecting this part of the structure is practically no different from the construction of a conventional absorption sewer well and depends on the type of material: brick, tires, wood, etc.
The absorption well of a makeshift septic tank with overflow can be made from old tires. This is an inexpensive, but not too durable way to build an autonomous sewer system.
Now it is necessary to bring a sewer pipe to the first chamber of the pit, as well as to install an overflow. The pipe is placed in a trench so that it is below the level of freezing of the soil.
As an additional protection against freezing, it is recommended to use insulating materials.
A sewer pipe leading to a cesspool with overflow is placed in a trench below the level of freezing of the soil, giving it a slight slope
The overflow is also set with a slope. It is made from a piece of plastic pipe with a diameter of 100 mm. The overflow is set so that the parts of the pipe protrude into the containers.
On them, you can install perpendicular vertical segments of the same pipe to improve the sewage system.
At the ends of the pipes, which play the role of overflow, it is necessary to install small vertical pipe segments, this will prevent the return of sewage in case of overfilling
At the same stage, strainers are installed, which, as mentioned above, must be inspected regularly and cleaned if necessary. However, pits with overflow in the form of a simple pipe segment also function quite successfully.
If water drainage through an additional drainage is provided from the filtering well, this pipe should also be laid in the ground on a crushed stone layer. Both cesspool chambers must be tightly closed. Often, concrete slabs with round or square holes for maintenance are used for this.
The holes are closed with special covers produced for the arrangement of sewers. Now you need to solve the issue of ventilation. For a traditional accumulative-type cesspool, it is mandatory in order to divert a significant part of fetid gases from the tank.
Convenient lids for maintenance and repair should be made on each tank that make up the cesspool with overflow
The method for removing methane gases generated during the processing of effluents depends on the type involved in the construction of bacteria. Some of them are already present in the sewage due to natural reasons, but the processing process is much more effective if special bacterial preparations are added to the accumulation department of the sewer construction.
There are aerobic and anaerobic microorganisms. The former need a constant influx of fresh air, i.e. they function only in the presence of oxygen. Anaerobic bacteria do not need access to air. It is such microorganisms that can carry out the process of processing wastewater in a sealed container.
If it is still necessary to provide the sewage system with ventilation, a special hole is made in the compartment lid for its arrangement. A pipe with a diameter of about 100 mm should be installed in it. The top of the pipe is closed with a special conical cap to prevent precipitation from entering the cesspool.
The process of creating a cesspool consisting of three compartments is not much different from the technology described above. Just instead of two wells make three. Accordingly, three pits will be needed, not two. Both first compartments are sealed and the last compartment is left permeable.
If it is not possible to discharge treated effluents into the underlying soil (for example, less than a meter between the bottom of the absorption tank and groundwater), they are redirected to drains or drainage fields through drains
Manufactured industrial septic tanks also work on the principle of multi-stage waste treatment using microorganisms. But they are considered more efficient, productive, and at the output they allow to obtain a significant amount of purified liquid suitable for technical use.
Installation of a septic tank is carried out by specialists and takes relatively little time. But given the cost of the structure, it should be supplemented by payment for the installation services of the structure in order to have a complete picture.
A cesspool with overflow is, of course, a more modern and convenient option for a conventional cesspool. Of course, the creation of a two-chamber or even three-chamber structure requires more material costs, time and effort. But all this will more than pay off in the future, when the residents of the house will feel the effect of using a reliable sewer that requires minimal maintenance.
If you have experience in the construction of cesspools with overflow or have already encountered this issue and have something to share with our readers, please leave your questions or valuable tips in the comments below.